Item# P-10390

PROACTIVE ENVIRONMENTAL PRODUCTS®

12 Volt Abyss 300® Plastic Pump

(Lifts 300 Feet / 92 Meters DTW)

(For 4" schedule 40 well or larger)

PLEASE EXCUSE OUR APPEARANCE. WE ARE CURRENTLY UPDATING THIS PAGE. 

GREAT NEWS...THIS PRODUCT IS AVAILABLE FOR PURCHASE. CALL US FOR TECHNICAL DATA IF NEEDED.

The Abyss 300 is a registered trademark ®

Specifications:

 When Using The Low Flow With Power Booster 4 Controller

POWER CONSUMPTION:                   75 WATTS (MAX)

VOLT RECOMMENDATION:               12-15 DC (direct current) At Source

MAXIMUM AMP OUTPUT:                 5 AMPS

MEASUREMENTS:                              LENGTH 12"/ DIAMETER: 3.83"

REQUIRED TUBING:                          3/8" ID or 1/2" ID TUBING

SUPPLIED WITH:                               310 FEET OF HEAVY DUTY 10 GAUGE WIRE, QUICK 

                                                        DISCONNECT PLUG & BATTERY CLAMPS

SEAL AND VALVE CONSTRUCTION:     VITON (IS STANDARD UNLESS REQUESTED OTHERWISE) 

 

Specifications:

 When Using The Abyss Solar Direct with LD and Float Switch

POWER CONSUMPTION:                   75 WATTS (MAX)

VOLT RECOMMENDATION:               12-15 DC (direct current) At Source

MAXIMUM AMP OUTPUT:                 5 AMPS

MEASUREMENTS:                              LENGTH 12"/ DIAMETER: 3.83"

REQUIRED TUBING:                          3/8" ID or 1/2" ID TUBING

SUPPLIED WITH:                               310 FEET OF HEAVY DUTY 10 GAUGE WIRE, QUICK 

                                                        DISCONNECT PLUG & BATTERY CLAMPS

SEAL AND VALVE CONSTRUCTION:     VITON (IS STANDARD UNLESS REQUESTED OTHERWISE) 

When Used With: Low Flow With Power Booster 4 Controller   

 

      Pumping Depth in Feet            Gallons Per Minute With            DTW (Depth To Water)          Abyss 300 Pump Connected

                    10                                             1.75   

                    

                    20                                            1.62

 

                    40                                            1.50

 

                    60                                            1.50

 

                    80                                            1.37

 

                  100                                            1.37

 

                  120                                            1.37

 

                  140                                            1.25

 

                  160                                            1.12

 

                  180                                             1.00

 

                  200                                             1.00

 

                  220                                            0.81

 

                  240                                            0.75

 

                  260                                            0.63

 

                  280                                            0.31

 

                  300                                            0.13

 

                  310                                      END OF WIRE

 

                  

Pump test was conducted with a 12 volt deep cycle battery

at 12.5 volts at battery terminals

 

Running your vehicle while using this pump

will dramatically increase purge volume

When Used With: Abyss Solar Direct with LD and Float Switch 

 

    Pumping Depth in Feet           Gallons Per Minute With    

    DTW (Depth To Water)          Abyss 300 Pump Connected

 

                   10                                             1.75   

                    

                   20                                            1.62

 

                   40                                            1.50

 

                   60                                            1.50

 

                   80                                            1.37

 

                 100                                            1.37

 

                 120                                            1.37

 

                 140                                            1.25

 

                 160                                            1.12

 

                 180                                             1.00

 

                 200                                             1.00

 

                 220                                            0.81

 

                 240                                            0.75

 

                 260                                            0.63

 

                 280                                            0.31

 

                 300                                            0.13

 

                 310                                      END OF WIRE

 

 

 

Pump test was conducted on a cloudless sunny day using a single 245 watt Hanwha solar panel that produced 30 volts (VMP) consistent with pump AMP draw of 8.64 per hour 

 

Abyss 300® REQUIRES EITHER:

OPTIONAL:

Our Location: 1767 Lakewood Ranch Blvd, Suite #113 Bradenton Florida 34211

Phone: 1.941.243.3930

Call Us Toll Free At:  (1.877.99.HYDRO) 

Note: Prices on our website are in USD

State Groundwater Sampling Procedures:

  • Alabama Groundwater Monitoring Well Sampling Procedures

  • Alaska Groundwater Monitoring Well Sampling Procedures

  • Arizona Groundwater Monitoring Well Sampling Procedures

  • Arkansas Groundwater Monitoring Well Sampling Procedures

  • California Groundwater Monitoring Well Sampling Procedures

  • Colorado Groundwater Monitoring Well Sampling Procedures

  • Connecticut Groundwater Monitoring Well Sampling Procedures

  • Delaware Groundwater Monitoring Well Sampling Procedures

  • Florida Groundwater Monitoring Well Sampling Procedures

  • Georgia Groundwater Monitoring Well Sampling Procedures

  • Hawaii Groundwater Monitoring Well Sampling Procedures

  • Idaho Groundwater Monitoring Well Sampling Procedures

  • Illinois Groundwater Monitoring Well Sampling Procedures

  • Indiana Groundwater Monitoring Well Sampling Procedures

  • Iowa Groundwater Monitoring Well Sampling Procedures

  • Kansas Groundwater Monitoring Well Sampling Procedures

  • Kentucky Groundwater Monitoring Well Sampling Procedures

  • Louisiana Groundwater Monitoring Well Sampling Procedures

  • Maine Groundwater Monitoring Well Sampling Procedures

  • Maryland Groundwater Monitoring Well Sampling Procedures

  • Massachusetts Groundwater Monitoring Well Sampling Procedures

  • Michigan Groundwater Monitoring Well Sampling Procedures

  • Minnesota Groundwater Monitoring Well Sampling Procedures

  • Mississippi Groundwater Monitoring Well Sampling Procedures

  • Missouri Groundwater Monitoring Well Sampling Procedures

  • Montana Groundwater Monitoring Well Sampling Procedures

  • Nebraska Groundwater Monitoring Well Sampling Procedures

  • Nevada Groundwater Monitoring Well Sampling Procedures

  • New Hampshire Groundwater Monitoring Well Sampling Procedures

  • New Jersey Groundwater Monitoring Well Sampling Procedures

  • New Mexico Groundwater Monitoring Well Sampling Procedures

  • New York Groundwater Monitoring Well Sampling Procedures

  • North Carolina Groundwater Monitoring Well Sampling Procedures

  • North Dakota Groundwater Monitoring Well Sampling Procedures

  • Ohio Groundwater Monitoring Well Sampling Procedures

  • Oklahoma Groundwater Monitoring Well Sampling Procedures

  • Oregon Groundwater Monitoring Well Sampling Procedures

  • Pennsylvania Groundwater Monitoring Well Sampling Procedures

  • Rhode Island Groundwater Monitoring Well Sampling Procedures

  • South Carolina Groundwater Monitoring Well Sampling Procedures

  • South Dakota Groundwater Monitoring Well Sampling Procedures

  • Tennessee Groundwater Monitoring Well Sampling Procedures

  • Texas Groundwater Monitoring Well Sampling Procedures

  • Utah Groundwater Monitoring Well Sampling Procedures

  • Vermont Groundwater Monitoring Well Sampling Procedures

  • Virginia Groundwater Monitoring Well Sampling Procedures

  • Washington Groundwater Monitoring Well Sampling Procedures

  • West Virginia Groundwater Monitoring Well Sampling Procedures

  • Wisconsin Groundwater Monitoring Well Sampling Procedures

  • Wyoming Groundwater Monitoring Well Sampling Procedures